Next up: power, the sliding door, and move the machines in. After that, I’ll be running the service circuits for all the gear, the fume hood and lighting, and building the tables for the forge and investment casting.
The picture with the half-wall is the side that the forge is going to go in. That wall will be closed (there was not enough metal) and I’ll put a couple big floor-standing cabinets in there.
The other end which is open, has a slight slope (you can’t see it) to the concrete so rain will not pile up on it. My intent is to build a raised floor at that end of the building, with a set of sliding doors and a sort of short porch.